Focal Maritime

Propeller Shaft

24/07/15

On the 09th of July 2015 MV Jochin arrived Malta / Valletta port  from Marseille to discharge one piece propeller shaft weight of approximately 40 tons . The vessel berthed upon her arrival at Palumbo shipyard  inside dock number 6.  The ship’s  part is to be fitted on LNG Bachir Chihani during her call at  Palumbo shipyard around the 20th of July 2015.


Back to All Articles